Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2608

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 久久久久这里只有精品| 8888四色奇米在线观看不卡| 精品国产一区二区三区成人| 成人亚洲欧美综合| 一级免费视频| 色 人 阁 七月| 欧美自拍亚洲| 美国性网站| 久久国产精品99精品国产| 国产精品入口免费视频| ww国产| 天天干天天干天天干| 婷婷丁香综合网| 日韩中文字幕精品免费一区| 欧美激情区| 免费久久精品| 久久精品123| 九九福利| 黄色网址国产| 国产亚洲欧美在线视频| 国产福利在线看| www.日本在线视频| 欧美激情亚洲精品日韩1区2区| 五月亚洲综合| 爽爽影院在线看| 日韩中文字幕久久久经典网| 欧美自拍偷拍视频| 欧美一级高清视频在线播放 | 福利社电影| 99这里只有精品66视频| 2020最新国产精品视频| 狠狠色噜噜狠狠狠狠97不卡| 久久亚洲午夜牛牛影视| 免费一级毛片在线播放不收费| 四虎成年永久免费网站| 四虎网站网址| 婷婷草| 婷婷综合缴情亚洲五月伊| 五月花综合网| 中国二级毛片| 天天射日日干|