色五月视频,久中文字幕中文字幕亚洲无线,国产大片在线看,欧美啪啪精品,国产精品欧美日韩,国产福利在线观看永久免费

Language:CHINESESENGLISH

Home > News > Installation details that must be paid attention to in steel structure processing
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.qmdif.cn

Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2234

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 激情综合网婷婷| 一级一毛片a级毛片| 黄色短视频免费看| 99re在线视频精品| 瑟瑟网站免费| 欧美劲爆第一页| 久久久久久久久久国产精品免费| 国产精品免费观看网站| h视频网站在线观看| 久久久久久久久久久久久久| 日韩 欧美 中文字幕 不卡| 男人天堂a| 久久青草18免费观看网站| 黄色网址视频免费| 国产羞羞| 国产精品久久久亚洲| 动漫羞羞网站| 99视频在线精品免费| 5月丁香婷婷| 91.九色夫妻| 免费在线观看a级毛片| 四虎永久在线观看| 四虎麻豆国产精品| 四虎国产| 四虎影院一级片| 四虎影院色| 四虎网站在线播放| 日韩欧美中文| 日韩a在线看免费观看视频| 欧美日韩视频在线观看高清免费网站| 美女视频一区二区三区| 久久精品看片| 久久精品国产亚洲a| 久久精品久久久久观看99水蜜桃| 精品一区二区三区四区五区 | 伊人网2021| 五月综合视频| 午夜国产小视频| 免费播放国产一级| 精品不卡一区中文字幕| 国产亚洲欧美久久久久|