During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2585

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 九九精品视频一区二区三区| a国产| 免费观看h电影在线观看| 国产毛片在线| 成人第四色| 久久天天躁狠狠躁夜夜| 四虎精品在线| 奇米影视第四影院在线观看 | 精品视频99| 国产精品久久久久久久久| 99re在线观看视频| 一级精品视频| 天堂在 线中文在线| 日韩高清一级| 奇米影视第四色888| 女人的影院| 精品视频一区二区三区免费| 日本一区二区三区四区不卡| 免费一级电影| 免费高清欧美一区二区视频| 久久久久久久国产高清| 精品久久中文字幕| 黄色成人短视频| 国产一区二区fc2ppv在线播放| 国产成人精品日本亚洲专| 97视频免费在线| 91久久精品国产91性色tv| 天天综合天天色| 天天看天天爽天天摸天天添| 国产精品亚洲综合色拍| 亚洲综合婷婷| 久热操| 亚洲色图激情文学| 亚洲国产日韩综合久久精品| 欧美综合色网| 2019天天操天天干天天透| 久久久久久97| 99久精品| 不良视频在线观看| 第四色播放器| 国产精品福利在线观看|