Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2321

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 色婷婷激情综合| 久久精品国产国产精品四凭| 五月婷婷中文| 欧美日韩色综合网站| 久久99国产视频| 国产精品观看视频免费完整版| 5月丁香婷婷| 五月天婷婷综合网| 青草久久伊人| 男人的天堂comwww| 久久久精品免费视频| 激情五月视频| 国产视频一区二区| 给我免费观看视频| www.婷婷.com| 91精品久久久久久久久久| 五月婷婷丁香花| 色视频在线免费| 日本精品久久久久久久久免费| 免费在线一区| 久久这里只有精品久久| 精品一区二区三区四区五区| 国产毛片高清| 国产成人区| 国产成人av在线| www.国产福利| www.草逼.com| 99热视| 99九九精品视频| 3d动漫精品啪啪一区二区中| 亚洲免费一区| 一级毛片在线全部免费播放| 四虎成人免费网站在线| 日韩精品毛片| 日日操人人| 色视频免费看| 四虎影院一区二区| 婷婷丁香在线观看| 一级毛片免费毛片一级毛片免费| 婷婷射丁香| 国内a级毛片|