Home > News > How to effectively improve the How can the installation accuracy of steel factory building be effectively improved?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.qmdif.cn

How to effectively improve the How can the installation accuracy of steel factory building be effectively improved?

Time:[2021-7-15]  Hits:2968

In the construction industry, as the use of steel factory building becomes more and more popular, more and more attention is paid to the production, transportation and installation technology of steel factory building, and at the same time, rapid development and continuous improvement have been achieved. How to further improve the production and installation accuracy of steel factory building and reduce costs are a topic facing the steel factory building industry. From the perspective of improving the installation accuracy of steel factory building, some issues and specific control methods that must be highly valued in the main links of production, transportation, and installation are analyzed and summarized.

 

 

Steel factory building production and transportation control


The precise size of the steel structure building is the basic and prerequisite to ensure the accuracy of the overall structural size and the smooth installation. Therefore, it is necessary to accurately grasp the straightness and distortion of the steel column, The distance from the connecting holes of the column and beam to the bottom of the column, the processing accuracy of the connecting holes, the straightness of the roof beams and the processing accuracy of the column-beam connecting plates, the position size of the tie bars or support connecting plates relative to the beam and column itself and the position size of the purlin brackets and etc.

 

 

In order to avoid and reduce the columns, beams, tie bars and other fittings deformation occurred during transportation, The transportation company should be required to add more support points in the full length range when binding the components, and use wood as hard as possible between them. The peripheral binding should be firm so as to minimize the deformation of the components due to vibration or heavy pressure in the transportation process. Two-point hoisting method should be used when loading and unloading. If the components are too long, a pole can be used and the hanging points should be appropriately increased; when the components are stacked at the worksite, the number of layers should be reduced as much as possible, generally no more than 3 layers, meanwhile, the supporting points should be appropriately increased to prevent the components from deforming under pressure. Never relax the control of transportation, lifting, unloading, stacking, etc. Otherwise, even if the steel structure plant’s components are made accurately, there will be problems in the transportation and other links, which will cause major troubles in the installation of the steel structure plant.

 

 


Quality control of steel factory building installation process

 

Before the steel factory building is installed, various preliminary work must be done in earnest. For example, before hoisting, the installer should retest the components, and hoisting can only be carried out under the premise that the components are not deformed and the installation dimensions are correct. In addition, after confirming that the strength of the foundation concrete meets the requirements of the specification, the installer should also inspect the embedded bolts or cup openings of the steel column foundation. If the position of the foundation and the elevation dimension are found to be deviated, the position should be recorded so as to adjust the position of the steel column.

 


In order to improve the installation precision of the overall steel factory building, it is best to choose the part of the workshop that has inter-column supports, tie rods and roof supports to install first. After this part of the steel column is hoisted, the axis and elevation of the steel column should be re-measured. After rectifying the deviation, the steel column is temporarily stabilized with the cable wind rope, and then the column supports, roof beams and inter-beam tie rods are installed. This is the so-called Rough installation.

 


All temporary fixing bolt holes that need to be welded on-site should be designed with long shaped holes, which is convenient for installation and adjustment, and is more beneficial to ensure the overall installation accuracy. The unilateral connecting holes of the purlin and other secondary components should also be designed with long shaped holes, of course, the related gaskets should be enlarged accordingly. Special attention should be paid to the fact that since the installation of the purlins is high-altitude operations and the wall is thin, if the installation holes are deviated and sprayed at high altitudes, it will indeed cause a lot of inconvenience, danger, and affect the appearance.


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 国产中文字幕第一页| 激情久久久久久久久久| 久久精品99精品免费观看| 国产91精品一区二区麻豆网站| 四虎最新免费观看网址| 欧美日韩亚洲综合| 久久婷婷午色综合夜啪| 四色在线观看| 欧美a在线| 久久免费视频精品| 精品久久久久久中文字幕女| 国产精品永久在线| 亚洲在成人网在线看| 猛男诞生记在线观看| 黄视频免费在线看| 99在线观看精品免费99| 日韩欧美中文字幕在线观看| 免费看毛片网| 久久免费香蕉视频| 久久99精品麻豆国产| 精品久久久久久久久久中文字幕| 国产精品综合一区二区三区| 国产99欧美精品久久精品久久| 99久久久久久久| 狠狠色狠狠色综合日日不卡| a级毛片在线免费观看| 五月天激情啪啪| 污网站视频在线观看| 四虎在线影视| 天天爽夜夜爽| 婷婷开心色| 婷婷免费高清视频在线观看| 色综合久久综合欧美综合| 毛片免费电影| 久久亚洲国产欧洲精品一| 久久精品国产精品亚洲| 国产午夜在线视频| 2021国产成人精品国产| 日韩精品福利| 美女视频免费观看网站| 久久这里只精品国产99热|