Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3172

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 五月开心婷婷| 久久国产免费| 午夜免费福利片观看| 欧美高清正版在线| 久久99国产精品久久99| 国产精品亚洲午夜一区二区三区| 97色在线观看免费视频| 婷婷视频在线| 日韩精品久久不卡中文字幕| 男女啪网站| 久草国产视频| 国内网友自拍视频| 国产精品日韩欧美亚洲另类| 澳门永久av免费网站| 2020国产成人精品视频网站| 中国一级毛片在线观看| 四虎影视免费在线| 欧美性生活视屏 | 免费黄色高清视频| 精品小视频在线| 国内外精品免费视频| 国产精品视频成人| 丁香九月婷婷| 成人精品一区二区不卡视频| 97在线视频gj| 97国产影院| 国产 日韩 欧美 亚洲| 伊人精品在线观看| 午夜国产精品视频| 五月婷六月| 五月综合激情网| 婷婷综合五月中文字幕欧美| 视频一区 国产| 视频一区二区免费| 四虎国产一区| 婷婷激情五月小说综合无弹窗| 手机福利在线| 五月婷综合| 亚洲精品99久久久久久| 激情天堂| 99国产精品|