Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4744

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青春草影院| 国产一级理论片| 四虎永久在线观看| 毛片网站在线| 国产中出视频| 短视频网站免费观看| 2000xx影院| 午夜国产福利| 日日操日日爽| 欧美日韩亚洲成人| 久久天堂一区二区三区| 激情小说婷婷| 国产视频在| 国产精品久久九九| 成人黄色小电影| 97在线视频免费公开观看| 亚洲国产成人久久77| 天堂综合网| 色婷婷在线观看视频| 青草久久精品亚洲综合专区| 快播短视频| 久久婷婷色| 久久精品国产一区二区三区| 狠狠色欧美亚洲狠狠色www| 国产精品视频一区二区三区| 成人精品视频一区二区三区| 久热久操| 天天综合久久久网| 在线免费观看毛片| 晚上看的www视频高清免费动漫| 日韩午夜免费| 日韩视频 中文字幕 视频一区| 欧美视频亚洲视频| 欧美色视频日本| 欧美色老头| 日本免费精品| 日韩中文字幕精品久久| 色视频免费| 婷婷色爱区综合五月激情韩国| 四虎在线永久精品高清| 五月激情六月婷婷|