色五月视频,久中文字幕中文字幕亚洲无线,国产大片在线看,欧美啪啪精品,国产精品欧美日韩,国产福利在线观看永久免费

Language:CHINESESENGLISH

Home > News > Foshan main steel members (b)
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.qmdif.cn

Foshan main steel members (b)

Time:[2016-5-14]  Hits:5064

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品亚洲自在线播放页码 | 99视频在线看| 欧美一区二区三区在线播放| 精品午夜一区二区三区在线观看| 把她抵在洗手台挺进撞击视频| 五月激情视频| 人人爽人人看| 免费一区二区三区四区| 黄视频网站在线观看| 公开免费视频| 99视频在线观看免费视频| 99国产精品免费观看视频| 色婷婷久久综合中文网站| 欧美性色视频| 男女男精品视频免费观看| 久久www免费人成_看| 激情丁香婷婷| 国产在线视频www色| 国产福利91精品| 99视屏| 58av国产精品| 午夜精品久久久久久久99热| 日韩视频久久| 欧美巨大精品欧美一区二区| 免费精品| 毛片在线观看地址| 久久青草视频| 久久精品视频日本| 黄色视屏免费看| 国产在线视频在线| 国产亚洲精品俞拍视频| 国产精品二| 国产精品久久久久久久久鸭| 东京天堂热| a久久| 成人四虎影院| 国产成人精品日本亚洲语音2| 成人伊人青草久久综合网破解版| www.亚洲视频.com| 不卡一区二区三区卡| 爱插综合网|