raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4653

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产国语一级毛片| 久久久久久亚洲精品中文字幕| 日韩视频精品| 久久久久久久国产免费看| 国产经典大片爱情片| 99精品欧美一区二区三区| 午夜国产福利| 色在线免费视频| 欧美性生活视频| 免费看的www视频网站视频| 九色视频网址| 国外精品视频在线观看免费| 国产成人在线视频播放| 99久久免费精品| 综合激情在线| 高清中国一级毛片免费| 天天草综合| 色视频免费| 全国男人的天堂网站| 欧美69式囗交视频| 男人的天堂最新网址| 开心激情网五月天| 久久国产区| 久久99九九99九九精品| 韩国剧情片的网址| 国产一级淫| 国产最新自拍| 国语视频在线观看免费| 国产视频一| 国外免费精品视频在线观看| 国产精品免费观看视频播放| 国产操片| 国产精品成人一区二区| 国产不卡在线蜜| 国产成人综合视频| 国产精品电影网在线好看| 国产精品九九九久久九九| 国产二区视频在线观看| 国产精品成人一区二区三区| 国产精品久久久亚洲456| 国产精品视频九九九|