色五月视频,久中文字幕中文字幕亚洲无线,国产大片在线看,欧美啪啪精品,国产精品欧美日韩,国产福利在线观看永久免费

Language:CHINESESENGLISH

Home > News > Macau's first single large span reticulated shell steel structure engineering cap
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.qmdif.cn

Macau's first single large span reticulated shell steel structure engineering cap

Time:[2015-10-14]  Hits:4753

Guangzhou Steel News: Macau's first single large span reticulated shell steel structure engineering cap

Recently, MGM Cotai hotel project engineering sky cap. It is reported that the project is two-way bias diagonal saddle hyperboloid form a monolayer structure large span reticulated shell, is the first in Hong Kong and Macao regions.

Reporters learned that the project by the China Building World Group general contractor, China State Construction Steel Co., Ltd. is responsible for construction and deepening of the design, manufacture and install. Engineering is about 1900 tons of steel, the maximum span of 140 meters, the projection area of ​​nearly 1.5 standard football field.


The project design dynamic lightweight construction steel structure is necessary to ensure that "no weight overruns," but also "the body strong enough." How to root after more than 5,000 bars and non-standard sizes like 1500 nodes personalized design and production of combines is a not a small problem, it is built in steel design staff, they repeatedly conducting research , from the cellular to be inspired, creative use of external double hollow hexagonal prism nodes form a useful structure to reduce the weight of a quarter, and is configured to connect stable. In the production chain, the project also "experience" to a lot of difficulty. Steel engineering project by each node 6 sizes totaling 48 parts board group fight together in diameter from 40 centimeters to 100 centimeters, the number of welds from 40-50, built in steel production staff He said welding this node is simply in embroidery, but by concentric positioning optimization, weld optimization and other measures, useful for the production of precision error strictly controlled within the requirements of British Standard Specification 3 mm. In the apparatus of the process, the use of point-in support system in a small space to ensure the load path clear, while using three-dimensional coordinates of the law means good control precision by 144 support points. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 清纯唯美亚洲综合日韩第| 国产美女精品在线观看| 日韩第3页| 久久一区二区三区不卡| 汉宫春晓61式图解| 国产黄色自拍| аⅴ资源中文在线天堂| 九九午夜| 五月亚洲综合| 色婷婷婷婷| 奇米777四色影视| 免费看的一级片| 久久精品视频日本| 激情婷婷六月| 国产日韩欧美视频在线| 成人丁香婷婷| 99久久99久久精品免费看子| 毛片福利视频| 婷婷综合激情网| 收集最新中文国产中文字幕| 热99视频| 青草国产视频| 欧美一区网站| 皮耶里诺再次出击意大利在线观看| 久久这里只有精品国产99| 久久毛片免费| 久久精品只有这里有| 久久国产成人午夜aⅴ影院 | 看免费一级毛片| 五月一区二区久久综合天堂| 婷婷综合五月天| 婷婷综合久久中文字幕蜜桃三| 四虎免费永久在线播放| 四房开心蜜桃| 婷婷色九月综合激情丁香| 婷婷四房综合激情五月性色| 四虎最新免费观看网址| 婷婷五月天.com| 伊人成年综合网| 91热成人精品国产免费| 亚洲艹|