Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.qmdif.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5314

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 色综合久久中文字幕| 国产精品四虎在线观看免费| 欧美爱爱片| 激情五月婷婷基地| 非会员体验60秒试看福利区| 夜久久| 色综合天| 青青草直播| 男女网站视频| 久久久久久久九九九九| 狠狠操五月天| 国产福利一区二区三区| a一区二区三区视频| 亚洲综合伊人| 五月婷婷丁香六月| 设计(2014)韩国| 日本不卡免费| 欧美一区二区三区高清视频 | 国产精品1区2区| 99在线观看免费视频| 1区1区3区4区产品乱码区| 婷婷丁香六月| 手机成人av| 十分钟完整视频| 日韩久久网| 欧美一级在线视频| 欧美日a| 男人天堂网www| 久久久99精品免费观看| 精品一二区| 九七色伦| 久久国产精品久久| 久久国产精品视频一区| 久国产| 久久国产精品高清一区二区三区| 黄色网址在线视频| 激情网网站| 精品一久久| 久久久久久国产精品mv| 久久不卡精品| 久久99热66这里只有精品一|