Steel works construction schedule control content

Time:[2014-11-15]  Hits:5284

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 色婷婷影视| 精品福利一区| 毛片免费全部播放一级| 欧美高清国产在线观看| 精品国产一区二区三区久| 成人综合网站| 天天干天天干天天干天天干天天干| 日本欧美小视频| 免费看毛片的网址| 久久国产精品久久久久久| 国产视频亚洲| 国产精品久久久久999| 99中文字幕| 97视频免费在线| 日韩在线2020专区| 五月综合激情网| 四虎影视大全| 日本精品久久久久中文字幕 1| 免费看亚洲| 蜜桃视频一区二区| 开心激情小说网| 久久精品亚洲视频| 久久成人国产精品二三区| 激情综合在线| 狠狠久久久久综合网| 国产小视频在线| 国产无限制自拍| 国产美女在线观看| 国产精品亚洲午夜一区二区三区| www奇米| 99视频精品全部免费免费观| 夜夜激情网| 亚洲欧美国产精品专区久久 | 玖玖国产在线| 久久免费国产视频| 久久久青草青青国产亚洲免观| 久久99精品麻豆国产| 久久精品二三区| 美女久久久久久| 免费观看毛片| 欧美日韩一卡二卡|