Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5060

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产福利精品在线| 四虎影院国产| 国产综合在线观看| a毛片久久免费观看| 五月婷婷六月丁香综合| 欧美日韩高清一区| 久久99久久99精品观看| 国产精品天堂avav在线| wwwcom黄色| 97精品在线观看| 亚洲免费一| 五月天网站最新的网址| 人成电影网在线观看免费| 免费一级电影| 久久青草精品免费资源站| 狠狠操欧美| 国产午夜电影网| 国产精品久久久久久久专区| 成人精品一区二区激情| 99久久综合给久久精品| 91亚洲国产| 一区二区三区不卡免费视频97| 五月开心综合| 四虎影片国产精品8848| 深夜福利一区| 色综合久久综合| 深爱激情成人| 偷拍亚洲欧美| 五月天亚洲综合| 五月天激情四射| 五月天丁香婷婷网| 婷婷丁香花五月天| 天天想你免费视频观看| 婷婷综合五月中文字幕欧美| 四虎网址大全| 国片一级 免费看| 亚洲永久在线| 2021国产精品最新在线| 97免费在线观看| 99视频网站| 福利一区二区视频|